
With the home-made sump fitted in Episode 12, the ST170 is finally ready to meet the Escort. To hold it there, Dave’s Garage UK makes his own engine mounts. This first part covers the steel plates that bolt to the block, a first attempt at dropping the engine and gearbox into the shell, and the change of plan when it won’t go.
Video: Dave's Garage on YouTube · watch “Ford Escort MK1 Project, DIY Engine Mounts Zetec Conversion. ST170. Part 1” on YouTube
What happens in Episode 13
The plan (0:26). The rubber mounts are Land Rover engine mounts from eBay, bolted to a standard Mk1 crossmember; he thinks a World Cup crossmember would be too stiff for road use. A plate goes on each side of the block, the engine is set level in the bay, and the gap between each plate and its mount is fabricated to fit.
What to dodge (2:08). The first plate spans three mounting points on the block while leaving access to the knock sensor (needed only if he goes the ECU route) and the oil pressure switch, which he’ll reuse as a pressure-gauge pickup.
Template, then steel (3:14). The shape is worked out in cardboard first, roughly 130 mm wide and 100 mm tall. Home-made centre finders (cut-down bolts ground to a point and heat-treated) locate the holes. The plate is plasma cut from 6 mm steel left over from the gearbox adaptor plate, and an old grinding disc serves as the template for a round plate for the mount side.
The harder side (12:00). On the other side of the block, four holes are needed later for an alternator bracket, and the dipstick must stay clear. He makes a plate across those four holes first. When the holes won’t line up, he drills them oversize, bolts the plate up with nuts on the back, welds the nuts to a second piece and uses that as a drill guide, piloting at 8 mm then 10 mm and bolting up as he goes so it stays square.
Spacers and a nearside plate (16:00). The mount plate for the nearside (left-hand) side then stands off that alternator plate on 20 mm tubes, cut from the 10 mm bore bar he used for crush tubes in the front chassis members. A shorter tube is measured and added at the bottom. He welds it with gasless MIG and is surprised how well it copes with the heavier steel.
Captive nuts (20:40). Nuts are welded to the back of the plates because a spanner won’t reach them once the engine’s in. A bolt with a chamfered end holds each nut central while it’s welded. Running the nut up to the top of the thread keeps weld spatter out of it.
Trial fit (22:00). With the gear lever out and a trolley ready to catch the gearbox, the engine and box go in on the crane, a yoghurt pot over the gearbox output to catch oil. They stick on the crossmember, even with the valve cover off. The real problem is that the gearbox needs to sit further back, so the tunnel opening will need trimming back about three inches.
Plan B (27:20). He takes the crossmember off and sets it under the engine on blocks, squared side to side and from above. It sits as far forward as he can go while leaving room for engine movement. One side has plenty of room for the mount; the other is tighter, as the Mk1’s mounting points were made for crossflow and Pinto engines, but he thinks it’s workable. The car will then come down over the engine.
Tips from the video
- Template in cardboard. Get the shape and holes right in card before cutting steel.
- Make a drill guide. Nuts welded to a scrap plate keep the holes square and lined up with the block.
- Leave it rough until it fits. The plates get tidied with a flap disc only once the mounts are finished.
Still to sort
- The rest of the mounts. Joining the plates to the Land Rover mounts, and the tunnel and front-panel trimming, come next.
Related
- Series page: the Dave’s Garage Zetec RWD conversion, episode by episode
- The previous video: Episode 12, fitting the home-made sump
- Where the steel came from: Episode 8, the gearbox adaptor plate
- Why the tunnel matters: Episode 10, moving the gear lever forward
- All our Mk1 Escort builds