
Episode 13 ended with Plan B: the crossmember set up under the engine on blocks, ready for the shell to come down over it. In part two, Dave’s Garage UK builds the mounts that join the engine plates to the Land Rover rubbers, gets the car over the engine and ends up with the ST170 level and square in the bay. It worked, he says, “sort of”.
Video: Dave's Garage on YouTube · watch “Ford Escort MK1 Restoration. DIY Engine Mounts and Fitting the ST170 Zetec RWD conversion.” on YouTube
What happens in Episode 14
Getting a spanner in (1:31). Viewers suggested modifying the crossmember for clearance; maybe next time, but the bracket is already built. Setting the mount lower leaves just enough room for a spanner on the bolt.
Building up the first mount (2:35). The idea is to connect engine and crossmember as one unit, then drop the car over it. Each piece is templated in cardboard, cut from steel, bevelled and tacked, spreading the load across the plate on the block rather than hanging it off a part with no connection to the block, while leaving room to reach the bolts.
The other side (8:52). As with the first side, one bolt couldn’t be withdrawn. Instead of a plain disc he extends the plate, boxes it in and adds a gusset, with a nut welded on the back, so the bolt still comes out. Possibly heavier than needed, he admits, but he won’t take a risk.
Lifting the car (11:30). The engine crane would be in the way, so he rigs a bar across to a gap in the garage roof and a winch from his bench. After an early failure an extra chain takes the tension; it only ever carries the light, empty shell.
Cutting the tunnel (13:42). The crossmember lines up and there’s good bulkhead clearance, but the gearbox fouls the tunnel. He cuts it back with a jigsaw, then cuts more as it keeps catching. The hole grows “alarmingly”, so the carpet set he hoped to use won’t fit and the gear lever will need a surround.
In, with casualties (16:53). The engine has to be tilted with the back jacked up, then the gearbox dropped so it will angle in. It goes in, but the VVT solenoid snaps off somewhere along the way. That part is no longer available, but it is apparently the same as a VW Passat one, and he has one on order for 15 quid. The cam cover’s breather, which seems to be some sort of alloy, possibly mazak, fouls the bulkhead, so he may cut it off and make a new outlet. The steering shaft clears the gearbox and starter.
Final fit (20:13). An engine support gadget from his mate Barry holds the weight while the mounts are set, which saves getting the engine crane out. The tacked mounts sit at a slight angle, so welds are cut, tabs moved back and re-tacked. Checked with a level, the engine matches the car’s own lean (about 2 mm off the line) and is square in the bay. There’s roughly a finger of clearance at the gearbox, which he says is the rule of thumb, and the sump clears. The mounts are fully welded, rounded off, primed and painted black, then bolted up for good.
Tips from the video
- Tack before you weld. Leave the mounts tacked until the engine is in place, because a small change in angle opens up the joints.
- Clean painted threads. He runs a tap through the threads and a 10 mm drill bit through the holes before bolting up.
- Make your own tunnel. With hindsight he’d build his own gearbox tunnel rather than use the automatic one, as he did on his Pop.
Still to sort
- Gearbox mount. Next video: BMW 3 Series bobbins, as on his Pop, with the gearbox resting on the mounts rather than hanging off them.
- Rolling chassis. The front suspension goes back on as a dry fit so the car can go over the pit. He plans coilovers, on Mk2 Escort struts he has been offered.
Related
- Series page: the Dave’s Garage Zetec RWD conversion, episode by episode
- The previous video: Episode 13, DIY engine mount plates, part 1
- The tunnel he cut back: Episode 5, fitting the big automatic gearbox tunnel
- The sump that had to clear: Episode 12, fitting the home-made sump
- All our Mk1 Escort builds